
ATO-TC-001 Manual Current Controller for Powder/Hysteresis Brakes (0-4 A)
Compact manual constant-current controller (24 VDC, 0-4.0 A in 0.01 A steps) that sets the coil current, and so the torque, of a powder or hysteresis brake load.
Specifications
| Rated torque | n/a (brake controller) |
|---|---|
| Load type | Brake controller (manual current) |
| Max speed | n/a |
| Heat dissipation | unknown |
| Control | Output 24 VDC / 0-4.0 A, 0.01 A steps; supply DC 26-28 V / 5 A; external potentiometer mode |
Who makes it
Need a different shaft, connector, firmware or enclosure, or a price at 1,000 units? Maglev takes the catalog part to the factory and comes back with a custom version and one fixed price.
Landed cost in the US
Total US duty on this part by where it is made (2026-10-29). Mexico shown before USMCA preference; qualifying goods enter duty free. Your factory choice, not the shipping port, sets the origin.
Loading duty data…
Compliance
| HTS classification | 8505.20.00.00 typical, not a ruling |
|---|---|
| NDAA | unknown |
| Blue UAS | unknown |
| FCC | n/a |
| Notes | Fanless, short-circuit protection, output enable/disable. Needs a separate 26-28 V supply. ATO also sells a digital version ATO-TC-002 (US$234.98, 0-10 V external control). Covers all brakes in this list whose rated current is ≤4 A. |
Works with
ATO ATO-PB-015 Single-Shaft Magnetic Particle Brake (15 N·m)ATO · CN · $388.23
ATO ATO-PB-050 Single-Shaft Magnetic Particle Brake (50 N·m)ATO · CN · $556.77
ATO ATO-PB-100 Single-Shaft Magnetic Particle Brake (100 N·m)ATO · CN · $1,038.46
Mitsubishi ZKB-2.5XN Powder Brake (25 N·m)Mitsubishi Electric · JP · Quote
Lanmec FZ25.K/F Magnetic Powder Brake (25 N·m)Lanmec · CN · Quote
Magtrol HB-750M-2 Hysteresis Brake (5 N·m)Magtrol · US · Quote
Magtrol HB-1750M-2 Hysteresis Brake (13 N·m)Magtrol · US · Quote
G-Plas FZ50-S Single-Shaft Magnetic Powder Brake (50 N·m)G-Plas · CN · $163Sources
- https://www.ato.com/manual-tension-controller-for-magnetic-powder-clutch-brakespecs, price $101.98, SKU, delivery 6-12 days; related ATO-TC-002 $234.98
Record confidence: REPORTED. VERIFIED means the maker's own documents; REPORTED means a credible third party; UNVERIFIED means a single weak source. Anything we could not confirm says unknown.